Implementation Plans
Implementation plans are step-by-step, checkbox-tracked task lists used by agentic workers to implement features. They live in docs/superpowers/plans/.
Available plans
| Plan | Date | Status | Tasks |
|---|---|---|---|
| 2026-07-30 Single-Box SCCM Core | 2026-07-30 | Complete | 8 tasks |
| 2026-08-01 Agent MECM Client Install | 2026-08-01 | Complete; live Task 5 accepted | 5 tasks |
| 2026-08-01 MECM VC++ Redist Dependency | 2026-08-01 | Complete; live x64/x86 baseline accepted | 3 tasks |
| 2026-08-30 Hands-Off Rerun and v1 Release | 2026-08-30 | Tasks 1–9 complete; Task 10 release finalization | 10 tasks |
2026-07-30 Single-Box SCCM Core
Goal: Build a PowerShell 7+ project that acquires approved installation sources and deploys a verified single-box MECM primary site through reusable, testable stages.
Tasks:
- Scaffold the PowerShell 7 module and Pester 6 test harness.
- Define and validate the non-secret YAML configuration contract.
- Implement verified acquisition from vendor sources and private installer vaults.
- Build the resumable stage engine and Autopilot Agent entry script.
- Implement Windows prerequisites and the single-box SQL Server stage.
- Implement MECM primary-site and core-role stages.
- Add live health validation, client proof, and CMTrace Open fixture curation.
- Document operator flows and complete the quality gate.
See docs/superpowers/plans/2026-07-30-single-box-sccm-core.md for the full plan with checkboxes.
2026-08-01 Agent MECM Client Install
Goal: Install and verify the Configuration Manager client on RING0IVY24-01 through a signed, typed Autopilot Agent work item.
Tasks:
- Setup-CM Client stage — complete.
- Server-side registration health gate — complete.
- Typed Autopilot Agent client work — complete upstream.
- Controller queue endpoint — complete upstream.
- Verify, deploy, and prove the live client path — complete and accepted.
See docs/superpowers/plans/2026-08-01-agent-mecm-client-install.md for the full plan with checkboxes.
Accepted evidence is in
docs/PHASE0-2026-08-29-LAB-INVENTORY.md. The signed Agent completed the typed
work on RING0IVY24-01; provider and SQL registration plus a fresh Health run
agreed.
2026-08-01 MECM VC++ Redist Dependency
Goal: Install and verify Microsoft VC++ v14 x64 and x86 runtimes before MECM downloads prerequisites or runs setup.
Tasks:
- Pin runtime detection with Pester — complete.
- Pin verified installation and stage order — complete.
- Make the source contract reusable and validate the reference lab privately — complete.
See docs/superpowers/plans/2026-08-01-mecm-vc-redist-dependency.md for the full plan with checkboxes.
2026-08-30 Hands-Off Rerun and v1 Release
Goal: Replace hardcoded compliance with real probes, automate bounded marker acceptance, prove two consecutive runs, and publish v1.
Tasks:
- Reconcile current project status and historical handoffs — complete.
- Pin evidence and compliance contracts — complete.
- Make Acquire read-only before apply — complete.
- Implement SQL desired-state reconciliation — complete.
- Implement MECM and read-only Health probes — complete.
- Productize marker acceptance — complete.
- Document and package the v1 workflow — complete.
- Complete branch CI and review — complete at the live-tested head.
- Run Windows/provider integration and two live runs — complete and accepted.
- Record acceptance, merge, tag, release, publish docs, and clean up safely — acceptance recorded; release finalization.
See docs/superpowers/plans/2026-08-30-hands-off-rerun-v1.md for the complete
test-first execution plan.